Quick answerThe usual order is: plan, rough electrical and plumbing, waterproofing, ceiling framing, tiling, carpentry and glass, painting, then fixtures and cleaning. Each step depends on the previous one being finished and checked.
Our guide on house finishing sequence after plaster goes deeper. Use this page as a quick checklist.
Order of work
- 1. Layout and point marking.
- 2. Concealed conduits and pipes, pressure test.
- 3. Waterproofing and flood test.
- 4. False ceiling framing and services inspection.
- 5. Flooring and wall tiles.
- 6. Carpentry, glass and fabrication fitting.
- 7. Painting and polish.
- 8. Fixtures, appliances, cleaning and handover.
Why order matters
- Cutting a finished wall for a pipe repair destroys paint and tile.
- Painting before carpentry fitting means repainting.
- Closing a ceiling before inspection hides faults.
What to inspect at each stage
- Photos of conduits and pipes before closure.
- Test records for pressure and flooding.
- Alignment and level of floors before fitting.
Tell us about your space
Message us on WhatsApp with what you want done and where in Indore. We reply with the next step and an itemised quotation after understanding your scope. Costs shown anywhere on this site are indicative and tentative; taxes are extra.
WhatsApp 9329262299 Get a smart estimate
Frequently asked questions
Can trades overlap?
Some can, if they do not damage each other. A coordinator plans overlaps.
Where does CCTV cabling fit?
With rough electrical, before ceiling closure.
When should I buy tiles?
Confirm quantity and size after the layout and before flooring starts.