Quick answerConcealed wiring needs correct conduit routing, wire gauge for the load, earthing and a properly arranged distribution board (DB). Changes after plaster are costly.
BuildSpace360 coordinates electrical with false ceiling, carpentry and HVAC. Always have the electrical load checked, especially for AC, induction hob and geysers.
What a good scope includes
- Point-wise layout agreed on a drawing.
- Separate circuits for AC, kitchen and heavy loads.
- DB with MCB and RCCB selected for the load.
- Earthing and testing report at completion.
Coordination
- Conduit routes before plaster and ceiling.
- Point heights matched to furniture and tiles.
- Data and CCTV cabling run in separate conduits.
Warning signs
- Wires without proper conduit.
- Mixed wire gauges for the same circuit.
- No earthing provision.
Tell us about your space
Message us on WhatsApp with what you want done and where in Indore. We reply with the next step and an itemised quotation after understanding your scope. Costs shown anywhere on this site are indicative and tentative; taxes are extra.
WhatsApp 9329262299 Get a smart estimate
Frequently asked questions
Can wiring be changed after painting?
It is possible but disruptive. Plan points before finishing.
Do you do rewiring of old homes?
Yes, subject to site inspection.
Do you handle panel work?
Yes, see our electrical and power service page.